Symptoms

OBI Apps: 11.1.1.8.1

You are using OOTB OBIA 11.1.1.8.1 and trying to configure the initial load for Finance, OM and SCM module. You are trying to generate a load plan with all the 3 - SDE, SIL and PLP. The load plan generation does not complete, the process takes a very long time. 

 

Cause