E1: SCHED: Frequently Asked Questions on EnterpriseOne Scheduler (P91300)
(Doc ID 1355467.1)
Last updated on MAY 20, 2024
Applies to:
JD Edwards EnterpriseOne Tools - Version SP24 to 9.2 [Release SP24 to 9.2]Information in this document applies to any platform.
Purpose
The EnterpriseOne Scheduler Application P91300 allows customers to setup pre-defined schedules for EnterpriseOne UBEs to be executed. Each job schedule specifies a version, the time, and the logical server where the UBE will run. Schedules can run one time only or recurring. These jobs are launched unattended. This document provides answers to some frequently asked questions on the Scheduler Application.
Note:
Only the EnterpriseOne Scheduler application is supported. Third party scheduler tools/applications are not supported.
Only the EnterpriseOne Scheduler application is supported. Third party scheduler tools/applications are not supported.
Questions and Answers
To view full details, sign in with your My Oracle Support account. |
|
Don't have a My Oracle Support account? Click to get started! |
In this Document
Purpose |
Questions and Answers |
Overview of the Scheduler Application (P91300) |
Client Application |
Scheduler Server |
Scheduler Application & Scheduler Tables |
Question 1: What is the Control Record? Can the Control record be re-created? |
Question 2: How to enable Scheduler to restart automatically? |
Question 3: What System values does P91300 use on AS400? |
Question 4: Why are there differing amounts of Scheduler jobs in F91320? |
Question 5: How and where is the Expiration Date Stored in Scheduler tables? |
Question 6: How to temporarily remove a job from Scheduler? |
Question 7: Jobs submitted from Scheduler are different than jobs submitted from Batch Versions (BV) |
Question 8: What effect is there if F91310 is empty after enabling Scheduler? |
Question 9: Why does running a UBE through Scheduler produce a UBE.LOG? |
Question 10: What will be happening when "No End Date" is set and Max Number of Job Resubmission is 5? |
Question 11: What is Elapsed time in Scheduler? This option is available in "Advanced Option" of the Job Schedule -> "Job Resubmission" tab. |
Question 12: How to produce CSV report submitted thru Scheduler? |
Question 13: What is Elapsed time in Scheduler? |
Question 14: How to revise a scheduled job ? |
Question 16: Apart from P91300 , is there any other Job Scheduling tool available within Oracle JD Edwards ? |
Question 17: How do you schedule a report in P91300 based on the work day calendar? |
Question 18: Is there any standard report to re-create the schedules in F91320 based on the entries in F91300? |
Question 19: Is there any procedure to stop the Scheduled Jobs which were disabled for some time to be submitted for the past scheduled times after the scheduled jobs have been re-enabled? |
Question 20: What is the recurrence type - Period? What is the logic under this recurrence type based on which schedule records will be created and how it is defined. |
Question 21: What does it means when scheduler launch status shows expired? |
Scheduler Kernel & Scheduler Server |
Question 1: How does the Scheduler Kernel work? |
Question 2: What is Index 11 errors associated with Scheduler Kernel? |
Question 3: Are multiple Scheduler Kernels supported in EnterpriseOne? |
Question 4: Can the Scheduler Server be stopped and started? |
Question 5: What implications are there if the Scheduler Server goes down? |
Question 6: Which OCM Data Source does the Scheduler Kernel use to determine the Enterprise (logic) Server to submit a scheduled job? |
Question 7: Is database cluster failover supported with the Scheduler Kernel? |
Question 8: Why is system allowing the user to schedule jobs for older date/time but doesn't execute the same after it is scheduled? |
Question 9: Does scheduler support multiple time zones when there is only one batch server? |
DST (Daylight Savings Time), Timezones & Scheduler |
Question 1: Does F91300 store time in UTC format and does it convert the time? |
Question 2: Is it necessary to have multiple DST rules? |
Question 3: How does Scheduler Server work with DST changes? |
Question 4: Can scheduled jobs ignore holidays by user or region? |
Question 5: Can Scheduler run Monday to Friday from 9am to 5pm? |
Question 6: How to change the timezone for all jobs when the Server moves to a different region? |
Question 7: After updating DST using P00085, table F00085A is updated but F00085 is not updated |
Troubleshooting Scheduler & Scheduler Errors |
Question 1: When is it necessary to apply an ESU for the Scheduler application? |
Question 2: How to terminate a Scheduler Job that ends in Error? |
Question 3: Job recurrence stops working after an ESU |
Question 4: Will changing batch queues impact processing of a scheduled job? |
Question 5: Error "Install Failed: Invaild object name - 1111" appears in server JDE.LOG when scheduling a job |
Question 6: Error "Invalid Password" appears on-screen on a web development/fat client when trying to type in a password for a scheduled job |
Question 7: Changes to Data Selection of an existing scheduled job are not reflected in the completed job's output. |
Question 8: Why does the E1 scheduler password field allow you to type more than 10 characters in the blank, if E1 (prior to release 9.2) has a maximum password size of 10 characters? |
Question 9: Error "Blanks Invalid" (error code 0003) is issued when attempting to save a recurring job from business function N91300A (CommitRecurrencePatternToDB). Why is that? |
Security, Users & Scheduler |
Question 1: Does Scheduler respect security set up for batch jobs? |
Question 2: Can a schedule job run under different E1 users? |
Question 3: How to update all scheduled jobs after user changes their password? |
Scheduler Reports |
Question 1: Can the records in F91300 & F91320 be purged using R91300B? |
Question 2: What reports are used for Scheduler? |
References |