E1: 31B: Multiple Vessel T2T After Lot Costs Doubled

(Doc ID 1917772.1)

Last updated on DECEMBER 10, 2015

Applies to:

JD Edwards EnterpriseOne Blend Management - Version 9.1 to 9.1 [Release 9.1]
Information in this document applies to any platform.

Symptoms

E1 9.1 / P31B31C Lot Costs
---
After Lot Costs are sometimes incorrectly doubled (from the Before cost) on some To Tanks in a T2T operation with multiple From and To vessels.

The following steps were performed to duplicate this issue:

1. A negative expense spread operation was performed on all From and To vessels used in the T2T operation.

2. The configured T2T operation Distribution Method = Equal (same test performed with Percentage, same results).
   There is no Cost Group setup on the T2T configured operation.

3. The tank to tank operation has multiple From tanks (2 tanks) and multiple To tanks (3 tanks).
     **In the Movement Detail sub-form : use Actual Move Entered Overrides (override the default move quantities, enter a different quantity).

Cause

Sign In with your My Oracle Support account

Don't have a My Oracle Support account? Click to get started

My Oracle Support provides customers with access to over a
Million Knowledge Articles and hundreds of Community platforms