E1: 32: P3210 Configuration Cost Calculation is Not Rounding Up (Doc ID 1947705.1)

Last updated on DECEMBER 15, 2015

Applies to:

JD Edwards EnterpriseOne Configurator - Version 9.1 and later
Information in this document applies to any platform.

Symptoms

Configuration Cost Calculation in P3210 is different from the way it calculates from Work Order Module, the Work Order Routing Cost in P3112 / P31022.
P3210 is not rounding up against Run Labor and Run Machine rate. For instance, taking Labor rate at $2,700,

A:Labor (Z1) $2,700
Run Labor Run Labor/Time Basis Cost(A1)
10.42 0.01042 28.134
1.74 0.00174 4.698
*No Round 32.832

But in Work Order Routing Cost, it was rounded up to

A:Labor (Z2)
Run Labor Run Labor/Time Basis Cost(A2)
10.42 0.01 27
1.74 0 0
*Rounded 27