Symptoms

E1 9.1 / R3483 Rate Schedule

When an item is set up as a Rate Scheduled item with Default Period of Weeks and the Forecast for that item does not have all of the demand
on the end of the week, MRP (R3482, R3483) plans both a weekly Rate plus a Work Order supply (messages, P3411) that creates an over supply.