Symptoms

 When the job has a percentage in the Threshold % Complete and the calculated  values is lower than this percentage and the value in the PO # 6 on the R51800 is blank the system is still creating journal entries.
 
The Threshold % Complete measurement is the level of completion for an account at which the actual cost becomes significant for projecting final costs. The system projects final costs when the percent complete is greater  than or equal to the threshold percentage.