E1: 51: R51902 (Forecast Post) Posts to Incorrect Periods (Doc ID 2204883.1)

Last updated on MAY 22, 2017

Applies to:

JD Edwards EnterpriseOne Project Costing - Version 9.1 to 9.1 [Release 9.1]
Information in this document applies to any platform.

Symptoms

When the R51902 (Forecast Post) is run to post the forecast information that is stored in the F5111 (Forecast Detail) to the F0902, it does not post to the correct months.  For example, if the first period of the forecast is shown as ending 11/30/2016 (and then period 2 ending 12/31/2016).  When the R51902 is run, the first period where information is posted in the F0902 is Period 1 of 2016 (as opposed to Period 11 of 2016).

This bug has been closed as functioning as designed.