Symptoms

When there is no default company set up in the processing options of P512000, it is possible in P512000 to search by period for from and thru dates.  If entering a 1 for both of these fields (from period 1 thru period 1), the system appears to default in January 2 as the from date when displaying information while the Project tab is open.  This is an issue because the system does not include any values that have a G/L date of January 1.