E1: 32: Standard Amount OPAT is Cleared for the Manufactured Component When Running R30835 calling WIP Revaluation R30837

(Doc ID 2423001.1)

Last updated on JULY 13, 2018

Applies to:

JD Edwards EnterpriseOne Configurator - Version 9.2 and later
Information in this document applies to any platform.

Symptoms


R30837 is clearing the Standard Amounts OPAT in the F3102 after WIP Revaluation is run over the component item of the configuration. No cost change was made for the item that is having its standard amount cleared

Would like to run the R30835, on just business unit,calling WIP Reval and not have the standard amounts cleared for manufactured components of configured work orders

Steps to reproduce:
1. Create a configured item. Set the cost methods to 07/08 and add a price
2. Create a purchased item to used as a component of the configured item with
a standard 07 sales inventory cost that has been simulated an frozen
3. Create a manufactured item to be used as a component of the configured
item and simulate and freeze its cost from a bill of material
4. Add a simple required configured item segment for the configured item from
step #1
5. Add a unconditional P Assembly Inclusion Rule including both purchased
item from step #2 and manufactured item from step #3
6. Enter a sales order for the configured item from step #1
7. Configure the order and note the sales order number
8. Inquire on the sales order to get the work order number from config
related orders off of the row exit from the detail
9. Run R31410 over the work order to attach the parts list. Make sure the
processing option #3 under the Sales/Config tab is set to update costs
10.Check the P31022 Production Cost Inquiry for the standard costs on both
the parent and components
11.Also review the P30026 costs for both components and parent
12.Without changing any costs for the components Run R30812 Cost Simulation
selecting on both component items
13.No cost changes were made to the components which is correct
14.Without changing any costs for the components Run Frozen Update R30835
calling WIP Revaluation R30837 for the two components
15.No cost changes were made to the components which is correct
16.However, when checking the P31022 Production Cost Inquiry for the
configured work order the standard amount OPAT is cleared from the
manufactured component on from the configured work order

Cause

Sign In with your My Oracle Support account