Symptoms
In a mulit-BOM the lower level qtys are not extended out by the required quantity of the upper level. For example if the lower level sub assembly component require 2 of each to make 1 of its sub assembly parent and sub assembly parent needs 2 to make the upper level parent then the multi-level BOM inquiry should show 4 ea of each of both the lower level components instead of 2.
Steps
- Create a manufactured item parent
- Create a sub assembly manufactured item
- Create two purchased parts
- Add a bill of material for the sub assembly with the two purchased parts from step #3. Make quantity per 2 ea for both purchased parts
- Add a bill of material for the parent from step #1 with the sub assembly from step #2. Make the quantity per 2 ea
- Go to menu G3011 for multi-level bill inquiry P30200
- Inquire on the parent item from step #1 for a quantity of 1
- The components of the sub assembly should display a quantity of 4 but instead they display a quantity of 2 which is incorrect
Changes
Cause
To view full details, sign in with your My Oracle Support account. |
|
Don't have a My Oracle Support account? Click to get started! |
In this Document
Symptoms |
Changes |
Cause |
Solution |
References |