On : 9.2 version, Project Costing

When printing the Job Status Inquiry Print report (R512000P) from the Report button in JSI, the UBE does not recognize the Thru Date entered in JSI. Instead, the UBE uses the current period as the Thru Date rather than the Thru Date entered into the JSI Display tab.