My Oracle Support Banner

E1: 49: P49640 Transportation Load Confirmation Updates Incorrect Load Status When No Shhipment Is Done (Doc ID 2756417.1)

Last updated on FEBRUARY 27, 2021

Applies to:

JD Edwards EnterpriseOne Transportation Management - Version 9.2 and later
Information in this document applies to any platform.

Symptoms

 

Changes

The load status is incorrectly updated when the shipment lines are not available for ship confirmation done by transportation load confirmation P49640.

Steps: 

  1. In P4210 create a transportation sales order with two detail lines shipping from two different branch plant.
  2. In P4960 build a load and add the above shipments to the load.
  3. Approve the load and the approved load status is at 28.
  4. In P4210 the sales order next status is at 560.
  5. Ensure that next status set at the P4205 version processing option is greater next 560. This P4205 version should be the version which is called from P49640 load confirmation.
  6. In P4960 inquire the load and take row exit for load confirmation.
  7. In load confirmation screen click Ok.
  8. The shipment lines are not displayed as the next status of the shipment is less than status mentioned in the processing option.
  9. The user accidently clicks OK in this screen and then clicks cancel to go back to load confirmation screen. The load status moved to 80.
  10. Even though ship confirmation did not happen still load is status moved to complete.

 

Cause

To view full details, sign in with your My Oracle Support account.

Don't have a My Oracle Support account? Click to get started!


In this Document
Symptoms
Changes
Cause
Solution
References


My Oracle Support provides customers with access to over a million knowledge articles and a vibrant support community of peers and Oracle experts.