E1:31B: R31B60 Trace/Track Does Not Trace Back All The Lots from the Selected Operation
(Doc ID 2792226.1)
Last updated on SEPTEMBER 20, 2021
Applies to:
JD Edwards EnterpriseOne Blend Management - Version 9.2 and laterInformation in this document applies to any platform.
Symptoms
When running the Trace/Track UBE (R31B60) on a “To” Vessel, with processing options set to perform Lot Tracing, the UBE does not trace back all the lots from the selected operation. The Work file, F31B60 is populated with just the selected operation.
Steps:
- Select a Bottling operation with a dependency chain of 3 or more operations (E.g.: CW2V, R2T, T2T, ADDV, T2T, BOTT)
- Set the processing option behind R31B60 to perform Lot trace, with Vessel ID and class set to the vessel ID and class of the Bottling vessel - (Can add more specific details on the PO setup behind R31B60 here)
- Run R31B60 with data selection set to the BOTT operation’s operation number
- Verify the records in the work file, F31B60. Notice that the work file has only been inserted with the selected operation’s vessels and lots and no further tracing was done.
Cause
To view full details, sign in with your My Oracle Support account. |
|
Don't have a My Oracle Support account? Click to get started! |
In this Document
Symptoms |
Cause |
Solution |
References |