E1: 32: Direct Labor Routing Costs (B1, C3 and C4) for Configured R AIRs Calculated by Order Processing - R31401 Are Incorrect and/or Inaccurate (Doc ID 2817250.1)

Last updated on OCTOBER 28, 2021

Applies to:

JD Edwards EnterpriseOne Configurator - Version 9.2 and later
Information in this document applies to any platform.

Symptoms

Routing Costs populating F3102 via R31410 are not being calculated correctly and/or accurately. This is for Direct Labor (B1, C3, C4)" so it only displays on a single row.

  1. Setup Costing Options in the MFG Constants Overheads Include the following:  Calc Var On Direct labor
     Cal fixed on Direct labor.
  2. Use a Work Center that has Frozen  Direct Labor, Labor Variable O/H, Labor Fixed O/H
  3. Using the P3003 - Add 3 Routing steps with Run Labor Only
  4. Using the P3293 R Rules -Add a Configured Routing Rule to pull in these 3 Routing Steps
  5. Create a Configured Sales Order
  6. Run the R31410 (PO Calculate Standard Cost=1)
  7. Review the P31022 Production Cost
  8. Note the Standard Amounts per each cost type of B1 (Direct Labor), C3
    (Labor Variable O/H), and Labor Fixed O/H .


Cause

To view full details, sign in with your My Oracle Support account.

Don't have a My Oracle Support account? Click to get started!