E1: 34: Can Material Requirements Planning (MRP) (R3482 & R3483) Parallel Processing Run in Multiple Environments at the Same Time?
(Doc ID 2830747.1)
Last updated on DECEMBER 28, 2021
Applies to:
JD Edwards EnterpriseOne Requirements Planning - Version 9.2 and laterInformation in this document applies to any platform.
Goal
The MRP Requirements Planning UBEs R3482 and R3483 can be set up to run Parallel Processing. Can R3482 or R3483 be run in Parallel mode in both the Production and non-Production environments at the same time (for example while testing)?
Solution