E1: 31: Attaching a WO Parts List Using Order Processing - R31410 Does not Use the Bill of Material Component Branch when Manufacturing Constants - P3009 is Set to Committing to Work Center Location (Doc ID 2873905.1)

Last updated on APRIL 04, 2025

Applies to:

JD Edwards EnterpriseOne Shop Floor Control - Version 9.2 and later
Information in this document applies to any platform.

Symptoms

When the Manufacturing Constants (P3009) are set to Commit to Work Center Location, upon attaching the Parts List and Routing using Order Processing - R31410, the system will not use the Component Branch from the item's Bill of Material (F3002) if it is different from the header.


Steps

  1. Set the Manufacturing Constants (P3009) with Backflush Options field set to 2 = Committing to W/C Location.
  2. Access the Work Center record (P3006) and make sure the Location Branch is the same as the header Branch.
  3. Create a Manufactured item (P4101/P41026) in the Branch from step 1.
  4. Create a Bill of Material (P3002) using a component detail line from a different Branch Plant; make sure to enter a specific Operation Sequence.
  5. Create an Item Routing (P3003) using the Operation Sequence from step 4 and using the Work Center from step 2.
  6. Create a Manufacturing Work Order (P48013) for the item.
  7. Run Order Processing (R31410) over the Work Order to attach the Parts List and Routing.
  8. Inquire on the Parts List (P3111); notice that the system created the component detail line using the Branch from the Work Center setup rather than the Bill of Material.
     

Changes

 

Cause

To view full details, sign in with your My Oracle Support account.

Don't have a My Oracle Support account? Click to get started!


In this Document
Symptoms
Changes
Cause
Solution
References


My Oracle Support provides customers with access to over a million knowledge articles and a vibrant support community of peers and Oracle experts.