E1: 31: Leadtime Rollup (R30822A) is not Creating Leadtime Level (F4102-LTLV) for All Items, When Using Master Routing With Multiple Branch Plants
(Doc ID 2987228.1)
Last updated on DECEMBER 27, 2023
Applies to:
JD Edwards EnterpriseOne Shop Floor Control - Version 9.2 and laterInformation in this document applies to any platform.
Symptoms
Leadtime Rollup (R30822A) is not creating Leadtime Level (F4102 | LTLV) for All items when using Master Routing with different Branch Plants.
STEPS
1. Create an item in two Branch Plants: M30 and M40.
2. Make sure both BP have Master Routing enabled in the MFG Constants P3009.
3. Create a Master Routing for the item in BP M30 and M40.
4. Create Cross-reference in P4104 for the item and Routings.
5. Populate MFG leadtime QTY for each item.
6. Run R30822A with PO #1 set for ALL.
7. Notice ONLY one of the BP was updated by R30822A.
Changes
Cause
To view full details, sign in with your My Oracle Support account. |
|
Don't have a My Oracle Support account? Click to get started! |
In this Document
Symptoms |
Changes |
Cause |
Solution |
References |