My Oracle Support Banner

E1: 43: Error E41102 "Country of Origin is required" is Set in P42053 Select Multiple Locations when Called from P43250 Receipt Routing Movement when Using Lots Assigned by Next Number (Doc ID 3010888.1)

Last updated on MAY 30, 2024

Applies to:

JD Edwards EnterpriseOne Procurement and Subcontract Management - Version 9.2 and later
Information in this document applies to any platform.

Symptoms

When attempting to receive a lot controlled item into stock using receipt routing with country of origin active using a default country and lot number is assigned using a next number Error E41102 "Country of Origin is required" is Set in P42053 Select Multiple Locations when Called from P43250 Receipt Routing Movement.

Replication Steps:

1) P4101. Setup a lot based item with Country of Origin Required checked and Lot Process Type = 2 Lots Assigned with Next Number.
2) P41026. Set Country of Origin = US and Country of Origin Required = checked Default is United States.
3) P4310. Enter a PO.
4) P4312. Activate Receipt Routing and set Country of Origin Required Default = 1.
5) P4312. Receive the PO into the route.
6)P43250. Set the P4312 version to be the same it was received with. Move the item so it is ready to go into stock then for the final step either use option 4 or take Multiple Locations row exit. Tab off the first line and the lot number will be assigned but error E41102 Country of Origin is required is set. At this point it must be populated manually and the user may need to go to the item branch to see what the default is.

Changes

 

Cause

To view full details, sign in with your My Oracle Support account.

Don't have a My Oracle Support account? Click to get started!


In this Document
Symptoms
Changes
Cause
Solution
References


My Oracle Support provides customers with access to over a million knowledge articles and a vibrant support community of peers and Oracle experts.