E1: 49: Load Approval Sets Completed WO Line (Status 95) Back To Status 40
(Doc ID 3014692.1)
Last updated on APRIL 04, 2024
Applies to:
JD Edwards EnterpriseOne Transportation Management - Version 9.2 and laterInformation in this document applies to any platform.
Symptoms
A completed Work Order (at status 95) that was generated by a Transportation SO line gets put back to status 40 when the shipment associated to the order is placed on a Load, and then the Load is approved.
The status is reset immediately after Load approval.
STEPS TO DUPLICATE:
- Configure a version of P4210 Sales Order entry to use a W line type, so that a Work Order is created.
- Ensure the Order and Line combination is present in the 49/SD UDC table so that a shipment is created.
- Raise an order, and note the associated work order; process it thorough parts list and completion so that the status reaches 95.
- Add the shipment to a Load, and then approve this Load.
- Observe that the WO status is changed from 95 back to 40 after Load approval. step details>
Changes
Cause
To view full details, sign in with your My Oracle Support account. |
|
Don't have a My Oracle Support account? Click to get started! |
In this Document
Symptoms |
Changes |
Cause |
Solution |
References |