My Oracle Support Banner

E1: 31: P31123 Understanding and Set Up Required for Super Backflush (Doc ID 626088.1)

Last updated on SEPTEMBER 10, 2023

Applies to:

JD Edwards EnterpriseOne Shop Floor Control - Version XE and later
JD Edwards EnterpriseOne Engineer to Order - Version 8.9 and later
JD Edwards EnterpriseOne Configurator - Version XE and later
JD Edwards EnterpriseOne Service Management - Version XE and later
Information in this document applies to any platform.

Purpose

This document contains the setup of the Bill of Material, Routing and Processing Option required to perform Super Backflush (P31123) and further definitions and use of many fields.

Overview

The system automatically deducts materials from inventory during operations that are defined as pay points throughout the routing instructions.  Super Backflush (SBF) enables you to simultaneously backflush materials and labor hours and to report items as complete.  Use the Super Backflush program (P31123) to enter completed and scrapped quantities by operation and employee.  The backflush procedure will perform these transactions by operation: issue parts to the process order, record hours and quantities against the process order and record inventory completions.

In the processing options, the Super Backflush process can be set up to be performed either automatically or interactively.  When setting up the process to run interactively, the system displays these programs after the completion information has been entered on the Super Backflush form: Inventory Issues (P31113),  Hours and Quantities (P311221) and Work Order Completions (P31114).

Super Backflush can be run in Blind Mode (Issues, Hrs & Qty's & WO Completions run behind the scenes) or interactively (Issues, Hrs & Qty's & WO Completion programs each are called). There is no batch application available.

Batch program R31123Z1I is used only for Super Backflush Inbound interoperability transactions, and these inbound transactions are used to update JD Edwards tables with Super Backflush information only when related data is received from outside of JD Edwards (from interfaces/other tools).  Please refer to E1: 31: R31123Z1I Super Backflush Interoperability Document 660276.1.

Also refer to E1: 31: P31123 Super Backflush Error IDs, Causes and Steps to Correct Document 835194.1 and E1: 31: P31123 Super Backflush FAQ Document 641992.1

Scope

 Production personnel will benefit from a better understanding of Super BackFlush setup and its use.

Details

To view full details, sign in with your My Oracle Support account.

Don't have a My Oracle Support account? Click to get started!


In this Document
Purpose
 Overview
Scope
Details
 Setup
 Routing (P3003)
 Text or Text Lines
 Equipment Number
 Bill of Material (P3002)
 Functionality
 Issues (P31113)
 Hours and Quantities (P311221)
 Completions (P31114)
 Reversals/Cancellations
 Operation Status (OPST) and Pay Point Status (PPRF)

 Work Order Status
 Moving Statuses
 Preventing WOs under status from view
 Serial Numbers
 Scrap
 Shrink
 Interactive Implications
 Accounting
 Completions With Backflush
 Troubleshooting Tips
 Tip 1:  Parts List Cannot be Deleted, Cannot Delete WO  
 Tip 2:  Equipment Number ASII Field is Not Stored Anywhere 
 Tip 3: No Quantity Entered in Super Backflush Grid
 Tip 4: No updates through R31422 for unplanned labor added through super backflush
 Tip 5: Running Super Backflush (P31123) combined with Completions With Backflush (P31114)
 Tip 6: Things to consider to change an existing work orders Part List (P3111) and Routing (P3112) to work with Super Backflush (P31123)
 P31123 Enhancement Requests
References

My Oracle Support provides customers with access to over a million knowledge articles and a vibrant support community of peers and Oracle experts.