E1: 31: Rate Schedules / Repetitive Manufacturing FAQ (Doc ID 629672.1)

Last updated on DECEMBER 05, 2022

Applies to:

JD Edwards EnterpriseOne Requirements Planning - Version XE and later
JD Edwards EnterpriseOne Shop Floor Control - Version XE and later
Information in this document applies to any platform.
System Code: 31-Shop Floor Management
P3109 - Enter/Change Rate Schedule
P3152 - Line Schedule Review
P3153 - Line Scheduling Workbench
P3156 - Line Sequencing Workbench
F4801 - Work Order Master File
F4801T - Work Order Master Tag File

Purpose

This document is part of an Information Center - to see other documents related to SFC, please use the links provided belowInformation Center: Overview of JD Edwards EnterpriseOne Shop Floor Control > Information Center: Using JD Edwards EnterpriseOne Shop Floor Control> Document 629672.1, and MRP's Information Center - to see other documents related to MRP, please use the links provided belowInformation Center: Overview of JD Edwards EnterpriseOne Requirements Planning > Information Center: Using JD Edwards EnterpriseOne Requirements Planning > Document 629672.1.

Users of JD Edwards EnterpriseOne's Manufacturing Shop Floor Control module will find these Frequently Asked Questions and Answers helpful when using / testing Repetitive Manufacturing (Rate Schedules) functionalities.  Refer to the main setup bulletin E1: 31: Rate Schedules: Set Up and Overview of Repetitive Manufacturing Document 625969.1 and E1: 34: R3482 R3483 MRP and Rate Scheduling Document 628774.1 for more information.

Questions and Answers

To view full details, sign in with your My Oracle Support account.

Don't have a My Oracle Support account? Click to get started!


In this Document
Purpose
Questions and Answers
 Question 1.  How can "closed" orders be prevented from displaying in the Line Schedule Review (P3152)?
 Question 2.  Is there a way to enter a rate schedule for a weekly date range of Monday thru Sunday instead of the typical Sunday thru Saturday?
 Question 3.  Why are rate schedules not visible in the Enter/Change Rate Schedule (P3109) when created from MRP?
 Question 4.  When creating a rate schedule (header) for a non-working day, why is the work order number generated?
 Question 5.  Why is the component item demand not spread over the entire period if a rate schedule is created manually and not from MRP?
 Question 6.  What is the process to use for one rate schedule to build different end items?
 Question 7.  Can a rate that was entered in error be closed?
 Question 8.  In P3411 there are incorrect Create rate messages when compared to the Time Series P3413?
 Question 9.  When does P3003 - Item Routing application create Error ID 3003A - "Invalid Line/Cell" in Repetitive Manufacturing?
 Question 10.  Is it possible to complete a rate schedule order with past or future request dates on current system date?
 Question 11.  Which processing option does the system use to control whether the quantities are pulled forward or pushed back in time?
 Question 12.  How does the sequence number impact whether this is possible (refer to scenario on Question 11)?
 Question 13.  How can the default sequence be manually overridden, to change the sequence number value of either the new rate, an existing rate, or both?
 Question 14:  Is it possible to create a SC rate schedule from a sales order using a W line type?
 Question 15:  Why are Rate based sub-assemblies not back-scheduled based on Level Lead time?
 Question 16:  Is there a Inter Op "Z" process or Mass Update program / UBE to load P31093 / F3109 Line Item Relationship?
References