System Code: 31-Shop Floor Management, P48013 - Work Order Header, P3002 - Bill of Material Revisions, P3003 - Work With Routing Master, P48013 - Manufacturing Work Order Processing, P3111 - Work Order Parts List

Purpose

This document is part of an Information Center - to see other documents related to Shop Floor Control, please use these links:  Information Center: JD Edwards EnterpriseOne Shop Floor Control > Information Center: Using JD Edwards EnterpriseOne Shop Floor Control > Note 631351.1

The purpose of this FAQ document is to provide answers to frequently asked questions regarding the work order header and related fields and topics.

Recommended readings:
E1: 31: P48013 Work Order Header Definition and Use Document 633410.1
E1: 31: P48013 - Creating Work Orders for Obsolete Items Document 632917.1
E1: 31: P48013 Work Order Start Dates & Back Scheduling Calculations Document 626117.1
E1: 31: Work Order (P48013) Interface with Sales Orders (P4210) Document 626019.1
E1: 31: Work Order Shrink Fixed / Percent (P48013/P31113) Document 625984.1

Questions and Answers

To view full details, sign in with your My Oracle Support account.

Don't have a My Oracle Support account? Click to get started!


In this Document
Purpose
Questions and Answers
 Question 1:  What date on the work order header determines what items are effective per the standard bill and routing when parts list and routing are attached?
 Question 2:  Is there any place in the system where the original requested date is stored?
 Question 3:  What are aliases RAT1 and RAT2 in the F4801 used for?
 Question 4:  Is there a way to prevent the creation of new work orders (P48013) for obsolete items or use-up items?
 Question 5:  If Work With Manufacturing Work Orders (P48013) is called directly from the Order Scheduling program (P31225), can orders can be entered?
 Question 6:  With a “W” Line Type sales order, what date from the sales order detail line populates the Requested Date (DRQJ) of the corresponding work order?
 Question 7:  How is a rework work order (RWK) created?
 Question 8:  Is it possible to view all open work orders on a calendar or Gantt chart?
 Question 9:  How does the manufacturing system assign work order numbers?
 Question 10:  Is it possible to run R31410 automatically upon completing P48013 work order entry?
 Question 11:  How to restrict P48013 to not create a work order for a parent item if required child items are not available in stock?
 Question 12:  Can a work order number be linked or related to a purchase order detail line and vice versa?
 Question 13:  Why is warning "Enter Change Order Missing Standard Frozen Cost Record in F4105" generated when entering a new work order (P48013, Header)?
 Question 14:  What is the maximum work order number (DOCO) limitation in F4801 ?
 Question 15:  Is it possible to manually create a Work Order for a Purchased Item of Stocking Type 'P' using P48013?
 Question 16The P3112 does not open from the menu fast path. Confirmed that DD Item OPCN exists. Is there setup to run P3112 from the menu?
 Question 17: What is the use of field RTG (Route Sheets) available in F4801 and F3111 tables?
 Question 18: What are the mandatory fields to populate in F4801 table to run R31410 successfully?
 Question 19: Is there an 'automatic' way to associate lower level (component) work orders to the end item work order?
 Question 20: How to process a BY item in a rework work order to have the same ingredients and CO BY without creating a recursive BOM?
 Question 21: How to manually update related order number (RORN) field in work order entry program (P48013)?
References