My Oracle Support Banner

E1: 30A: R30812 Simulated or Standard Cost Rollup (Cost Method 07) Setup and Use (Doc ID 643052.1)

Last updated on SEPTEMBER 06, 2023

Applies to:

JD Edwards EnterpriseOne Product Data Management - Version XE and later
Information in this document applies to any platform.

Purpose

The Manufacturing Cost Simulation program is R30812. It is referred to by several different titles: Simulate Standard Rollup, Cost Simulation, Cost Roll and Simulate Rollup. The processing options are release specific, and can vary from release to release.

This document is supplemented with these other important Product Costing documents:

E1: 30A: Set-up Overview for Manufacturing Product Costing and Mfg Accounting (R30812/R30835/R31802A/R31804) Document 627300.1
E1: 30A: R30812 Product Costing Troubleshooting and FAQ Document 626098.1             
E1: 30A: R30812 Cost Simulation Troubleshooting Common Issues Document 643468.1                  
E1: 31A: R30812 Troubleshooting Process, Co/By-Products Cost Simulation Issues Document 972050.1

This document supplements existing documentation in the Product Costing and Mfg Acctg guides; all releases accessible from Document 1109538.1, review Chapter 4 "Working with Product Costing" in the online 9.1 guide.

 

Scope

 Applicable to accounting personnel and production engineers.

Details

To view full details, sign in with your My Oracle Support account.

Don't have a My Oracle Support account? Click to get started!


In this Document
Purpose
Scope
Details
 Overview
 Prerequisite
 Item Master Setup (G4111/P4101)
 Item Branch/Plant Setup (G4111/P41026)
 Accounting Cost Quantity (ACQ)
 Rates and Factors ( X Costs)
 Master Routings
 Phantom Items
 Process Manufacturing (Co/By-products, Process)
 Processing Options
 Reports
 Viewing Output
 Troubleshooting Tips
 Tip 1.  X Cost Doubles and Increments with Each R30812 Run
 Tip 2.  Is it possible to simulate costs reading from a particular lot/location cost?
 Tip 3.  Is it possible to use Simulated Cost Rollup (R30812) to roll up Alternate BOM's or Routings?
 Tip 4.  After running R30812 over a finished good, it is missing the part of the material cost.
 Tip 5.  Are Substitute items on a Bill of Material (P3002) costed by R30812?
 Tip 6. Can R30812 roll up a zero A1 Cost Record for the Parent Item when the components has Zero Cost? This is required since PO receipt process does not allow receipt of an item with no standard cost with setup in the plant that has a Sales/Inventory cost method = 07.
 Tip 7. What does R30801 Costing Exceptions Report  error 'No Acct. Lot Size for Setup' mean?
 Tip 8. When doing single level cost roll ups with the R30812 the lower level sub item or component item cost is not rolled to the parent item. Why?
 Tip 9. Is it possible to roll X cost on a component to the A1 cost line of the same component?
 Enhancment Requests
References

My Oracle Support provides customers with access to over a million knowledge articles and a vibrant support community of peers and Oracle experts.