E1: 34: Project Manufacturing and Production Number Reported Bugs, Solutions and Enhancement Requests
(Doc ID 646524.1)
Last updated on AUGUST 01, 2023
Applies to:
JD Edwards EnterpriseOne Shop Floor Control - Version 9.1 to 9.1 [Release 9.1]JD Edwards EnterpriseOne Requirements Planning - Version 9.1 to 9.1 [Release 9.1]
Information in this document applies to any platform.
Symptoms
Project Manufacturing enables you to create production controlled items and use unique production numbers to track orders and inventory associated with customer orders. Enhancement was introduced in 9.1, and is used in Manufacturing and also Purchasing and Sales.
Attached is a listing of Issues and the document that details the Bug(s) that may be pertinent to your environment when using Project Manufacturing, also abbreviated as Project Manufacturing Production Number (PMPN).
Currently applicable to P3411 (Messaging), R3482/R3483 (MRP), P3460 Forecasting and P4310 (Purchase Orders), and Sales Order Related (P4210, P4205, R42800, R42950, JP420000). Included are the changed BSFN.
Some enhancement requests included as well.
Changes
Cause
To view full details, sign in with your My Oracle Support account. |
|
Don't have a My Oracle Support account? Click to get started! |
In this Document
Symptoms |
Changes |
Cause |
Solution |
P3411, R3482, R3483 Related Bugs |
Issue 1. No Messages Generated for PMPN Items if Forecast Request Date is a Non-Working Day |
Issue 2. Transfer Order (OT) Msgs (P3411) Missing Production Number (Corresponding Sales Order (ST) has Production Numbers |
Issue 3. Defer (D) Message Not Generated for PMPN Component Items |
Issue 4. MRP Generates New Order & Expedite (B) Msg When a Supply (WO) and Demand (SO) Exist on Same Past Due Date |
Issue 5. MRP Plans Incorrectly for PMPN Items ignoring Freeze Fence |
Issue 6. Demand for PMPN Item OPC = Periods of Supply Not Planned Correctly by MRP |
Issue 7. P34404 Reassigning a Production Number for a Work Order Doesn't Work with 'Reassign Work Orders' Button |
Issue 8. PMPN MRP Orders Not Planning Like Non-PMPN Orders |
Issue 9. R3483 Multi-Plant Not Correctly Planning Production Number Controlled Items |
Issue 10. No Messages Generated for PMPN Items if Forecast Request Date is a Non-Working Day |
Issue 11. PMPN Items - P3411 Shows Messages for Sales Order Demand Only |
Issue 12. MRP Not Planning Lower PN Controlled Items When L/T Puts Demand Date in the Past |
Issue 13. MRP creates G message for an item with production number. This occurs only when request date is non work day (E) in shop floor calendar. |
Issue 14. P3413 suggesting defer message for 1st Work order but either a B or O message for the 2nd work order. |
Issue 15. When running R3482 with Generation Type 5, MRP with Frozen MPS, getting cancel messages for work orders having a Production Number. |
Receipt Routing (P43250) |
Issue 1. MRP does not take into account the quantities on purchase order receipt routing in inspection. |
Forecast (P3460) Related Bugs |
Issue 1. Setting MN02 (month format -01) as segment type for production number, automatic generated production number missing zero in month |
Purchasing (P4310) Related Bugs |
Issue 1. PO Entry (P4310) Checks for Production Number in Item Branch/Plant for Non-stock Items |
Issue 2. Transfer Orders not created with auto-generated Production Number for Production controlled item |
Issue 3. Production Number was wiped out after revision from Purchase Order Entry (P4310) for configured item |
Sales Order Related (P4210, P4205, R42800, R42950, JP420000) |
Issue 1. JP420000 Sales Order Manager Production Number Cleared On Update Production Number is over written with a new one |
Issue 2. Production Number (F4211.PMPN) Not Generated When Version Used With BSSV |
Issue 3. Production Number Not Generated In Sales Entry Modification |
Issue 4. R42800 reduces on hand quantity from different Production Number rather to one given in Sales Order Detail line |
Issue 5. Production Number is retrieved wrong ('0' dropped from Month) while trying to regenerate from P4210 row exit |
Issue 6. When R42950 run, F34401 new production numbers are generated for every cost updated |
Issue 7. Production Number locations are ignored on multiple lines at Ship Confirm using Row Exit |
Issue 8. Error ID: 34401B - Production Number Entered is Invalid |
Issue 9. Production Number in P42101 is locked after the order is submitted |
Issue 10. Production Number in P4210 is locked after entry and blanked out |
Issue 11. PMPN Disabled in Blanket or Quote Release (P420111) |
Current Enhancement Requests |
References |