My Oracle Support Banner

WS: 31: Work Order (P48013) FAQ (Doc ID 1530234.1)

Last updated on AUGUST 25, 2023

Applies to:

JD Edwards World Shop Floor Management - Version A7.3 cume 4 and later
Information in this document applies to any platform.

Purpose

To document the frequently asked questions regarding Work Orders (P48013).

Questions and Answers

To view full details, sign in with your My Oracle Support account.

Don't have a My Oracle Support account? Click to get started!


In this Document
Purpose
Questions and Answers
 Question 1:  Is there a way to prevent copying the lot ID number when a new work order header is added by copying an existing work order that has a lot ID?
 Question 2:  How do you stop or control default comments from being placed into the Work Order Instructions file F4802 when a Work Order is created?
 Question 3:  Can you re-open a closed work order to perform more activity?
 Question 4:  How is the field Quantity on WO Receipt (QWBO) in Summary Availability (P41202) populated from the Work Order header file?
 Question 5:  Can Enter/Change Orders (P48013) calculate the Requested Date based off of the Effective Date?
 Question 6:  When is it possible to restart work order numbering back to number one?
 Question 7: When creating a new work order header by copying an existing work order header, why are several fields not cleared or blanked out?
 Question 8: What is the Effective Date (ETDJ) field used for?
 Question 9: When changing a the work order request date (DRQJ) will the related work order dates be updated?
 Question 10: Can the parent work order number be set to automatically populate?
 Question 11: When creating a work order header is it possible to have the Bill Type (TBM) and Routing Type (TRT) display as RWK as the default instead of displaying a M Bill and Route Type?
 Question 12: What is the best way to reverse a previously completed and closed work order without having to reopen the work order?
 Work Order Status
 Question 1:  Is there a file/program that tracks the manufacturing WO Status Changes?
 Question 2:  How do you track work order status changes?
 Question 3: Can the associated descriptions for Work Order Status (WASRST) be changed? Ex: Status 40 and 45.
 Work Order Parts List
 Question 1: Why is same item number allowed to be entered as a parent and its own component in a Work Order header and parts list?
 Question 2:  What field contains the total quantity of material that was issued to a work order?
 Work Order Routing
 Question 1: Is it possible to prevent a work center from being manually entered on a work order routing? 
 Technical
 Question 1:  How Does The F00165, EnterpriseOne Generic Text File Work With World Manufacturing?
 Question 2:  Can the Co-existent Triggers in F00165 be Disabled?
 Question 3:  What is the processing option USER-DEFINED PROGRAM used for?
 
References

My Oracle Support provides customers with access to over a million knowledge articles and a vibrant support community of peers and Oracle experts.