Can the Simulation Engine be Setup to Use the Distributed Engine? (Doc ID 1224403.1)

Last updated on JUNE 27, 2011

Applies to:

Oracle Demantra Demand Management - Version: 7.3.0 to 7.3.0 - Release: 7.3.0 to 7.3.0
Information in this document applies to any platform.

Goal


The simulation engine uses only a single engine when submitted and is not executed in a distributed mode.

For example:

The user creates a promotion at the national level. The user submits the simulation. It takes 5 hours for the simulation to finish. The simulation request is being submitted to only one engine even though there 40 engines created.

As a perspective, the full batch engine completes in 11 minutes when all the 40 engines are used.


Solution