Inaccurate Gross Requirements for a Component Item in MRP
(Doc ID 1420944.1)
Last updated on JANUARY 29, 2022
Applies to:
Oracle Materials Requirement Planning - Version 11.5.10.2 to 12.1.3 [Release 11.5 to 12.1]Information in this document applies to any platform.
Goal
The gross requirements for Component1 are not correct.
We have two bills of material where this same Component1 is used.
Final Assembly1 - Gross Requirements are correct
-> Phantom1
-> Assembly1 - Gross Requirements are not complete for the time horizon and are lower than expected
-> Assembly2 - Gross Requirements are not complete for the time horizon and are lower than expected
-> Component1 - Gross Requirements are not complete for the time horizon and are lower than expected
Final Assembly2 - Gross Requirements are correct
-> Phantom2
-> Assembly3 - Gross Requirements are not complete for the time horizon and are lower than expected
-> Assembly4 - Gross Requirements are not complete for the time horizon and are lower than expected
-> Component1 - Gross Requirements are not complete for the time horizon and are lower than expected
How do we get the gross requirements to show up properly for Component1?
Solution