Network Charging and Control (NCC) Procedure to Stop and Start a Scalable Clustered SMS Server for Maintenance
(Doc ID 1477840.1)
Last updated on SEPTEMBER 02, 2022
Applies to:
Oracle Communications Network Charging and Control - Version 4.3.0 and laterInformation in this document applies to any platform.
Goal
Provide a procedure to stop Network Charging and Control (NCC) processes on a two node, scalable, clustered SMS (Service Management System) so that the RAC (Real Application Cluster) Oracle database can be stopped and archive log mode enabled, before bringing the NCC SMS services back up.
The following procedure is generic in form and must be adapted to each specific Customer platform and environment. It is provided as an example of the required steps needed so that database maintenance tasks may be performed on a clustered SMS with RAC database. No guarantee is given that all necessary steps are provided. The example commands and output shown may be different on your systems and are only provided as a guide.
Solution
To view full details, sign in with your My Oracle Support account. |
|
Don't have a My Oracle Support account? Click to get started! |
In this Document
Goal |
Solution |