My Oracle Support Banner

EBS-PS : Production Scheduling Launch FAQ (Doc ID 1566703.1)

Last updated on DECEMBER 24, 2018

Applies to:

Oracle Production Scheduling - Version 12.1.3 to 12.2.4 [Release 12.1 to 12.2]
Information in this document applies to any platform.

Purpose

 This document lists out FAQs you may encounter while performing a PS Launch.

Questions and Answers

To view full details, sign in with your My Oracle Support account.

Don't have a My Oracle Support account? Click to get started!


In this Document
Purpose
Questions and Answers
  Planned Orders Outside the Horizon being Pulled into PS.
 Why does PS Launch take long to complete?
 Why "Fixed Time Fence" in PS Plan options is including non-working days(off days) with respect to manufacturing calendar ?
 Why are my Sales Order Demands not brought into PS when PS plan is run without referencing ASCP, MDS or Cat Codes?
 Why are sub assembly orders started only at the end of the horizon delaying the FG items schedule?
 How to set the profile option "MSC: PS/SNO Data Store Path" ?
 Why do some of my work orders not have routing attached in them, when planned orders for the same item come in correctly with the routing attached?
 Why is my 'ASCP Plan Reference' field in PS plan option disabled/grayed out?
 Why is my PS model empty even when the PS Launch and Integration Requests complete successfully? 
 In VCP 12.1.3.8 when profile option MSC: PS/SNO API Version is set to 3.7, launch PS plan does not shows any data in PS model. Why?
 Why Purchase Requisitions are not brought into PS?
 Can 'Oracle Label Security' be applied to Production Scheduling?
 Why is the namespace prefix ":ps" missing in the model file generated by PS after applying the patch 16592789:R12.MSC.B?
 Why do I get the error 'The parameter is incorrect' when I open my PS model xml?
 Why do some of my resources not enter PS?
 Why do I not see my EAM WOs in PS?
 What are the steps which need to be followed to purge a PS Plan?
 When using ASCP plan referenced PS plan, Why manually created work orders are not pulled in to PS ?
 When PS plan is referenced with ASCP plan & demand time fence is set to "ZERO", no sales orders are pulled into PS, why ?
 Is it possible to increase the Decimal Precision value beyond '6', within PS Plan Options> Schedule Parameters ?
 Why is dynamic capacity setup in EBS not extracted to PS in VCP 12.2.5 version?
References

My Oracle Support provides customers with access to over a million knowledge articles and a vibrant support community of peers and Oracle experts.