EBS:PS: Multi-Line Entries Not Handled In Work Order Notes Section (Doc ID 1939301.1)

Last updated on NOVEMBER 09, 2015

Applies to:

Oracle Production Scheduling - Version 12.2.4 and later
Information in this document applies to any platform.

Symptoms

On :  Production Scheduling (PS) 12.2.4 version, Planning Engine

ACTUAL BEHAVIOR  
---------------
When you enter Work order notes with more than 1 line and re-solve the model PS does not preserve the original line break structure.
As example you can enter the original text as
Line1
Line2
Line3
but after re-solving it - the following is displayed: Line1Line2Line3.

EXPECTED BEHAVIOR
-----------------------
The line break in the WO notes should be maintained