Symptoms

Issue Reported on MSS Version 6.2.1build 348:

On a SONET Network System with ring topology, when a connection is assigned at a specific position in one of the ring segments, the application does not assign the connection to the same position in the other segments. 

E.g  When making a DS3 assignment on position 2 with a vacant position 1 on the 201(facility designation) connection, the SONET connection is getting the DS3 in the next available vacant position (1) on the 101(facility designation) connection, rather than on the position that was assigned on the 201 connection.It seems that MSS is not keeping the the 101 and 201 connections in sync with the DS3 assignments on each position. 


This was working as expected in  earlier MSS versions like 6.0.16.

Changes

 MSS version change from 6.0.to 6.2

Cause

Sign In with your My Oracle Support account

Don't have a My Oracle Support account? Click to get started

My Oracle Support provides customers with access to over a
Million Knowledge Articles and hundreds of Community platforms