Goal

Running an Unconstrained plan, using Shipping Networks and Sourcing Rules, the question asked is as follows:

In Shipping Networks, we load in-transit lead time for different (multiple) shipping methods between 2 Organizations in the shipping network for Internal shipments.

What logic does ASCP use to select one shipping method (In-transit Lead-time) over the other if we have more than one shipping method and in-transit lead-time available?
 

Solution