Goal

In MWM 2.2 and prior, the M1-CDIGANTT Algorithm could be updated to change the “Use Of Task Type as Task Text (Y/N)” parameter to 'Y' to display the Task Type code on the Tasks within the Gantt chart.

The release of MWM 2.2.0.1 added CM versions of the above Algorithm (CM-CDIGNTSW) and the Scheduling Gantt Zone (CM-CDIGANTT). This should allow the user to change the values of the parameter from within the application. After making updates to the new CM Algorithm parameters, the changes are not reflected on the CDI Gantt even after flushAll, clearing local IE/java cache, logging out/in, etc.

Solution

Sign In with your My Oracle Support account