Linked Activities Considered As Separate Activities Using Drip Mode/Drip Horizon
(Doc ID 1989956.1)
Last updated on MARCH 18, 2019
Applies to:
Oracle Utilities Mobile Workforce Management - Version 2.1.0 to 2.2.0.0.0 [Release 2.1 to 2.2]Information in this document applies to any platform.
Goal
A crew shift was created with:
Drip Mode: Standard
Drip Horizon: 2
One regular activity and 2 linked activities were created and assigned to this shift. However, only one of the linked activities was transitioned to Queued-For-Dispatch. The other stayed in Being Scheduled state.
Status of activities on Shift:
Activity 1 - Queued-For-Dispatch
Activity 2 (linked) - Queued-For-Dispatch
Activity 3 (linked) - Being Scheduled
The crew shift was started on the device and only Activity 1 and Activity 2 were dispatched.
As soon as Activity 1 was completed, Activity 3 transitioned to Queued-For-Dispatch and after some time got dispatched on the Device.
How should Linked activities be dispatched?
If activities are linked, should both get dispatched at the same time?
Solution