Shifts Not Created In Real Time Scheduler Due to Maximum Number Of Shifts Reached In MWM v1.4.5.
(Doc ID 2040282.1)
Last updated on FEBRUARY 03, 2019
Applies to:
Oracle Utilities Mobile Workforce Management - Version 1.4.5.22 and laterInformation in this document applies to any platform.
Goal
Some shifts are created in the system and not getting created by Real Time Scheduler.
Error message in the log is
717727: SCH188 15/06/15 11:32:54.05 send SWITCH.3348 0021:1045279 >>ERROR|||SHIFT||||WOLHEAT-20150627||||unable to add shift; Can not exceed the MAXIMUM of shifts<<
717728: SCH188 15/06/15 11:32:54.05 send GUI.3476 0023:1187274 >>ERROR|||SHIFT||||WOLHEAT-20150627||||unable to add shift; Can not exceed the MAXIMUM of shifts<<
717729: SCH188 15/06/15 11:32:54.05 ERROR: (unable to add shift; Can not exceed the MAXIMUM of shifts) generated in gen\src\hipgen\rcv_Shift.c at line 471
717736: SCH188 15/06/15 11:32:54.05 send SWITCH.3348 0021:1045281 >>ERROR|||SHIFT||||WOLHEAT-20150628||||unable to add shift; Can not exceed the MAXIMUM of shifts<<
717728: SCH188 15/06/15 11:32:54.05 send GUI.3476 0023:1187274 >>ERROR|||SHIFT||||WOLHEAT-20150627||||unable to add shift; Can not exceed the MAXIMUM of shifts<<
717729: SCH188 15/06/15 11:32:54.05 ERROR: (unable to add shift; Can not exceed the MAXIMUM of shifts) generated in gen\src\hipgen\rcv_Shift.c at line 471
717736: SCH188 15/06/15 11:32:54.05 send SWITCH.3348 0021:1045281 >>ERROR|||SHIFT||||WOLHEAT-20150628||||unable to add shift; Can not exceed the MAXIMUM of shifts<<
Is there a way to increase the MAXIMUM number of SHIFTS from 8192 to a higher number? And if yes, what is that number and what is the optimal #?
Solution