Goal

The M1-RequestShiftManifest web service returns workDuration and driveDuration fields with same value. This value also represents the total time from Logon to Logoff.

1) Shouldn't driveDuration only contain the drive time for the shift?
2) What is the difference between driveDuration and totalCalculatedTravelTime value ?
3) Shouldn't the workDuration field only contain the sum of the activity durations?

This can also be seen in the database in the M1_CREW_SHFT_SCHED.M1_DRIVE_DURATION and M1_CREW_SHFT_SCHED.WORK_DURATION fields.