When The Execution Of Replsizeprofile Batch Should Be Planned: Phase 3 Or Ad-hoc Phase? (Doc ID 2276784.1)

Last updated on JUNE 16, 2017

Applies to:

Oracle Retail Merchandising System - Version 15.0.1 and later
Information in this document applies to any platform.

Goal

In Retail Merchandising System (RMS) Operations Guide, Batch Overviews and Designs, there is reference to a pre-dependency for the execution of replsizeprofile batch, before the execution of rplatupd batch. Rplatupd batch must be run on Phase 3.
Considering that pre-dependency is correct, shouldn't the execution of replsizeprofile batch be done on phase 3 instead of ad-hoc phase?
 

Solution