EBS: PS: Oracle PS Is Not Considering Duration Between Same Setup Type
(Doc ID 2299659.1)
Last updated on SEPTEMBER 11, 2019
Applies to:
Oracle Production Scheduling - Version 12.2.5 and laterInformation in this document applies to any platform.
Symptoms
PS VCP 12.2.6. C609
PS IS NOT CONSIDERING DURATION BETWEEN SAME SETUP TYPES.
The client has a business requirement, where they assign same setup type say 'X' to more than one routing (item) say A, B and C.
When using duration of say 15 minutes for the setup type where both 'From' and 'To' are same, say X to X = 15 minutes.
However, PS is not considering the duration assigned to the changeovers X to X, when the Routings (operations) are different for the same changeover.
Is this functioning as designed?