D2-Math Usage Rule Totalizing Demand Across Meter Exchanges For A Single SP
(Doc ID 2305360.1)
Last updated on JUNE 03, 2024
Applies to:
Oracle Utilities Meter Data Management - Version 2.1.0.3 and laterInformation in this document applies to any platform.
Symptoms
The Vector and Service Quantity Math (D2-Math) usage rule is inappropriately summing the KW service quantities across devices for the same SP. The required behavior is that the max is taken for multiple meters on a single SP, but the sum of the SPs are provided to CC&B. This is currently not possible with the current D2-Math Calculation Function.
Example:
Usage Subscription
- SP1, meter 1: 30 KW
- SP1, meter 2: 25 KW
Summary SQ using D2-Math (Sum UT SQ) = 55 KW
Desired SQ using D2-Math = 30 KW