How Are 'Resources (used/total)' In ORS v1 Resource Planner Screen Calculated With View Attributes?
(Doc ID 2321607.1)
Last updated on NOVEMBER 14, 2019
Applies to:
Oracle Real-Time Scheduler - Version 4.5.0 and laterInformation in this document applies to any platform.
Goal
It's our understanding that 'Resource (used/total)' shown at the bottom of the window in Planner signifies the number of vans available for a depot. In Planner for depot 1234 it is showing 'Resources (used/total): 1/5'. For this depot there is only 1 driver available. The same behavior is observed for other depots. How are these values determined?
Solution