Symptoms

When placing a Point-to-Point cross-phase jumper (i.e. a jumper that goes between a single-phase-A conductor and a single-phase-B conductor), the Look Ahead panel shows "Phases to Operate: ABC", which is wrong.
Point to point cross phase jumper Look Ahead shows incorrect phases to Operate

Changes

 

Cause