Meter Install Date Time is Same as Removal Event Date Time Should Cause Error
(Doc ID 2345886.1)
Last updated on SEPTEMBER 30, 2022
Applies to:
Oracle Utilities Meter Data Management - Version 2.1.0.3 and laterInformation in this document applies to any platform.
Symptoms
In MDM when a meter has Install Date Time is the same as Install Event Removal Date Time no error occurs. It is expected that this should return error.
Steps To Recreate
1. Create Device, Device Configuration and Scalar Measuring Component.
2. Create a Service Point and install the above meter (ex: install date/time = 01-01-2017 12:00AM).
3. Remove the meter on the same date/time as the install date/time (i.e. 01-01-2017 12:00AM).
4. Meter is removed without throwing any error.
Cause
To view full details, sign in with your My Oracle Support account. |
|
Don't have a My Oracle Support account? Click to get started! |
In this Document
Symptoms |
Cause |
Solution |
References |