EBS:PS: Why Is PS Creating Extra WO Operations with a Number Bracket in the End? (Doc ID 2492832.1)

Last updated on NOVEMBER 12, 2021

Applies to:

Oracle Production Scheduling - Version 12.2.5 and later
Information in this document applies to any platform.

Goal

PS 12.2.5 C639

Why is PS creating extra WO operations with a number bracket in the end? For example, under Work Order Operations subfolder, the following operation is shown:

043|17078ABR|M |.0000|10.00| | |0431004(1).

 

Solution