EBS:PS: PS Application Not Offloading With DRA Accelerated Solver
(Doc ID 2499636.1)
Last updated on JULY 15, 2020
Applies to:
Oracle Production Scheduling - Version 12.2.6 and laterInformation in this document applies to any platform.
Symptoms
PS 12.2.6 C647
The PS Solver is not offloading with DRA Accelerated Solver under certain situations. This appears to be due the fixed time fence ending in the middle of a calendar event.
- If you change the FTF to 7 days the results are OK.
- If you turn off accelerated dispatching, the results show the jobs scheduled across the various resources. However, this results in an increase in solve time.
Changes
Cause