Why Instruct Operation From Planned Switching Step Are Not Allowed To Complete From Control Tool
(Doc ID 2526378.1)
Last updated on MAY 31, 2024
Applies to:
Oracle Utilities Network Management System - Version 1.12.0.3 to 2.4.0.0.0 [Release 1.12 to 2.4]Oracle Network Management for Utilities - DMS - Version 1.12.0.3 to 2.4.0.0.0 [Release 1.12 to 2.4]
Information in this document applies to any platform.
Goal
Why are operators not allowed to complete the Instruct Operation from Planned Switching Step via the Control Tool?
We could see the Control.xml and its not configured for planned sheet.
Any specific reason for this not configured for Planned sheet
Solution