29720092 IO Calc Wrong Safety Stock When Manufacturing Lead Time Variability Specified In Item Simulation Set Matches Plan Options Default Setting (Doc ID 2538932.1)

Last updated on AUGUST 19, 2019

Applies to:

Oracle Inventory Optimization - Version 12.2.4 and later
Information in this document applies to any platform.

Symptoms

On : 12.2.4 version, Engine Comp for Oracle RiskOpt in Test

Users are on 12.2.4 and have applied VCP Cum Patch 12.2.4.1 - 19549533 -
Using 64 bit Linux for IO with version MSRNWL64.ppc
120.17.12020000.58.1220402.12 from one off patch 29306036. They also have a
beta fix for MSRNWL64.exe from bug 29409725

@item = JMIOEndItem
@item = JMIOSubAssy
@org = TST:M1
@org = TST:M2

BOM
===
JMIOEndItem
- JMIOSubAssy
 
 There are other components but only these two are set for IO Planning for the moment
 
 Flow of Material
 ================
Org M1 is where the end item is final assembled and shipped out
 
Org M2 is where the component subassy = JMIOSubAssy is made and shipped to M1 to go into the end item = JMIOEndItem
 
 Testing Mfg LT Var at Plan option level and Item Mass Maint - in both cases Demand variability is minimal (MAPE=1%); Postponement not used
 ===================
 @Test_1 >> Plan Name = JM_IO_1 (PLAN_ID=8032). This Plan has Manufacturing LT Variability specified in Plan Option (=30%). Please note it has an Item Simulation Set (for setting LT etc.), but there is no value specified for Manufacturing LT Variability for the two items. So this is the plan option level test

@Test_2 >> Plan Name = JM_IO_2 (PLAN_ID=8027). This Plan also has Manufacturing LT Variability specified in Plan Option (=30%). But the Item Simulation Set has values (=30%) specified for Manufacturing LT Variability for both items.

The expectation is that the IO SS output would be identical as 30% in the plan options and even specifying it at 30% in IMM would not expect to change the SS

Test 1 outcome:
================
@Org = M1
@Item = JMIOEndItem
Projected SS (Units) = 2262

@Org = M2
@Item = JMIOSubAssy
Projected SS (Units) = 51447

Test 2 outcome
===============
@Org = M1
@Item = JMIOEndItem
Projected SS (Units) = 5386

@Org = M2
@Item = JMIOSubAssy
Projected SS (Units) = 22866

Users don't understand why the difference between the two test outputs

EXPECTED BEHAVIOR
-----------------------
Expected IO SS values to be the same between the two IO plan runs

STEPS

The issue can be reproduced at will with the following steps:
1. Run one IO plan with only 30% Mfg LT var in the plan options
2. Run same exact plan only specify 30% Mfg LT Var in the IMM for two items
3. Compare both plan outputs for the same end item and component
4. Find SS units are different

Cause

To view full details, sign in with your My Oracle Support account.

Don't have a My Oracle Support account? Click to get started!


In this Document
Symptoms
Cause
Solution
References


My Oracle Support provides customers with access to over a million knowledge articles and a vibrant support community of peers and Oracle experts.