Both the Travel to Assess and Travel to Repair Time Is Added for Ert Calculation
(Doc ID 2559718.1)
Last updated on DECEMBER 04, 2019
Applies to:
Oracle Utilities Network Management System - Version 2.3.0.2.0 and laterOracle Network Management for Utilities - DMS - Version 2.3.0.2.0 and later
Information in this document applies to any platform.
Goal
**Disclaimer:** This KM article may include the following abbreviations:
ERT - Estimated Restore Time
Both the Travel to assess and travel to repair time is added for ERT Calculation for an event which is already en-routed with a crew who can do both assess and repair.
If the same crew can do both assess and repair then, why are two travel times added for the ERT calculation?
As per your configuration lineman can do both assess and repair. So only one travel time should be considered for an event enrouted with Lineman crew.
But the system is taking both. Difference between ENR ert and ONS ert is about 1:20 which is a combination of the 2 travel times.
Solution
To view full details, sign in with your My Oracle Support account. |
|
Don't have a My Oracle Support account? Click to get started! |
In this Document
Goal |
Solution |
References |