My Oracle Support Banner

Redlines Getting Wiped Out After Change Gets Implemented (Doc ID 2611988.1)

Last updated on NOVEMBER 25, 2019

Applies to:

Oracle Agile Product Collaboration - Version 9.3.5.0 and later
Information in this document applies to any platform.

Symptoms

On : 9.3.5.0 version, Changes

ACTUAL BEHAVIOR
---------------
Redlines getting wiped out after change gets implemented

EXPECTED BEHAVIOR
-----------------------
It should not delete

STEPS
-----------------------
The issue can be reproduced at will with the following steps:
1.Connecting to MCAD via MCAD connector.
2.Create Item (XYZ-123) get drawing number for it in SolidWorks 2017
3.Now check in this Item to Agile from SolidWorks
4.Log in to Agile and bring up newly added Item (XYZ-123) from
Solidworks.
5.Add Manufacture to Item(XYZ-123) & create Bom (doc type) for it
6.Add newly created Doc to BOM then create Manufacture Change for it
7.At this point Redline the Item
8.Move the work flow to Review status
9.Now log in as new user who has all these groups assign to him and move work
to Approve state
10.Go back to Affected Item tab to make sure all the Red Lines are there
11.Now approve the Manufacture Change, at this point the Workflow is in
Systems Integration phase
12.Red lines are still intact
13.Now user has to perform checkin & checkout to update the drawing
(XYZ-123) (performed Load to CAD)
14.Log back to Solidworks and update the design (approve) and check it back
in to agile
15.At this point go back to agile move the workflow to next status
16.Check if the Red Lines are there and they are no longer there


Changes

 

Cause

To view full details, sign in with your My Oracle Support account.

Don't have a My Oracle Support account? Click to get started!


In this Document
Symptoms
Changes
Cause
Solution
References


My Oracle Support provides customers with access to over a million knowledge articles and a vibrant support community of peers and Oracle experts.