My Oracle Support Banner

Manual Step Addition In Switch Sheet Doesn't Always Show All Available Options (Doc ID 2812028.1)

Last updated on OCTOBER 06, 2021

Applies to:

Oracle Utilities Network Management System - Version 2.4.0.0.0 to 2.5.0.1.0 [Release 2.4 to 2.5]
Oracle Network Management for Utilities - DMS - Version 2.4.0.0.0 to 2.5.0.1.0 [Release 2.4 to 2.5]
Information in this document applies to any platform.

Symptoms

Manual Step Addition in Switch Sheet doesn't always show all available options

It seems in order to get all available options to show up in the Select Operation dialog in switching sheet Manual Addition Step, you have to open the Control Tool first, otherwise not all options are listed.

STEPS
This requires that a QUALITY_[measure] value be something specific or the [measure]_OFF be set to true for the control action to be visible on the control tool.
This will be project specific.

o Find a control action on a device with the above mentioned check as part of the control action's Visible-when clause.
o Log into Web Workspace without bringing up the Control Tool.
o Load a switching sheet and navigate to the Steps tab.
o Display the Manual Step Addition panel.
o Manually enter in the device you found in step 1.
o Bring up the Operations List for that device.

Expected Behavior:
If the control action is configured with a switching code, then it will show up in the list.

Previous Behavior:
The control action was not showing up in the Operations List. If the control tool for that device was first displayed, then the Operations List was properly populated with all the options.

Changes

Cause

To view full details, sign in with your My Oracle Support account.

Don't have a My Oracle Support account? Click to get started!


In this Document
Symptoms
Changes
Cause
Solution
References


My Oracle Support provides customers with access to over a million knowledge articles and a vibrant support community of peers and Oracle experts.