Volt/Var Optimization Slow Cycle Dependent On Feeder Load Management Forecasting Setting (Doc ID 2906388.1)

Last updated on MAY 31, 2024

Applies to:

Oracle Utilities Network Management System - Version 2.4.0.1.0 to 2.5.0.2.0 [Release 2.4 to 2.5]
Oracle Network Management for Utilities - DMS - Version 2.4.0.1.0 to 2.5.0.2.0 [Release 2.4 to 2.5]
Information in this document applies to any platform.

Symptoms

On : 2.5.0.1.0 version, Web Workspace

Volt/Var Optimization (VVO) Slow cycle is currently dependent on Feeder Load Management (FLM) forecasting setting

The VVO Automatic slow cycle does not generate events when FLM forecasting is disabled for the corresponding feeder.

VVO Slow Cycle should work irrespective of whether the FLM setting is in the forecast or real-time when the forecasting Window is set to 1.


The issue can be reproduced at will with the following steps:
Find a suitable area to test slow cycle optimization

Make the following changes on the Feeder Management tab in config assistant:

For the transformer/bus entries : Make automatic(slow) or manual(slow) and pick a Optimization objective (eg CVR)
For all downstream circuits: Enable Optimization

For all those feeders put FLM into "Real-Time" mode - no forecasting.

Enable manual VVO

Observe that after 15 minute cycles no plans are generated for the selected region
Observe that after hourly cycles plans are generated for for the selected region

Verify that transformer and downstream circuits do not have FLM forecasts.


Changes

 

Cause

To view full details, sign in with your My Oracle Support account.

Don't have a My Oracle Support account? Click to get started!


In this Document
Symptoms
Changes
Cause
Solution
 Fix Description
 Migration
References


My Oracle Support provides customers with access to over a million knowledge articles and a vibrant support community of peers and Oracle experts.